summaryrefslogtreecommitdiffstats
path: root/usr.bin/calendar/day.c
Commit message (Expand)AuthorAgeFilesLines
* typo.wosch1997-10-261-2/+2
* Many places in the code NULL is used in integer context, wherephk1997-09-181-3/+3
* Use err(3). Abort if strdup() returns NULL.charnier1997-06-231-9/+13
* Fix calendar so that it doesn't report strange results onmpp1997-02-021-2/+8
* Fix calendar so that you can run it like:mpp1997-01-121-2/+9
* Localize even more.ache1996-05-101-11/+4
* Allow to configure national Easter names.ache1996-05-101-33/+39
* Localize itache1996-05-101-2/+86
* Easter was one day to fast.wosch1996-04-091-3/+3
* Change calendar to report the actual date for variable day events.mpp1996-04-061-3/+20
* - handle events that move around from year to year, i.e.,wosch1996-02-021-0/+370
OpenPOWER on IntegriCloud