summaryrefslogtreecommitdiffstats
path: root/block
diff options
context:
space:
mode:
authorVenkatesh Pallipadi <venki@google.com>2010-10-04 17:03:21 -0700
committerIngo Molnar <mingo@elte.hu>2010-10-18 20:52:26 +0200
commit305e6835e05513406fa12820e40e4a8ecb63743c (patch)
tree8b43703e27d26f4a7e743a99459e0b465cd1e5e1 /block
parente82b8e4ea4f3dffe6e7939f90e78da675fcc450e (diff)
downloadop-kernel-dev-305e6835e05513406fa12820e40e4a8ecb63743c.zip
op-kernel-dev-305e6835e05513406fa12820e40e4a8ecb63743c.tar.gz
sched: Do not account irq time to current task
Scheduler accounts both softirq and interrupt processing times to the currently running task. This means, if the interrupt processing was for some other task in the system, then the current task ends up being penalized as it gets shorter runtime than otherwise. Change sched task accounting to acoount only actual task time from currently running task. Now update_curr(), modifies the delta_exec to depend on rq->clock_task. Note that this change only handles CONFIG_IRQ_TIME_ACCOUNTING case. We can extend this to CONFIG_VIRT_CPU_ACCOUNTING with minimal effort. But, thats for later. This change will impact scheduling behavior in interrupt heavy conditions. Tested on a 4-way system with eth0 handled by CPU 2 and a network heavy task (nc) running on CPU 3 (and no RSS/RFS). With that I have CPU 2 spending 75%+ of its time in irq processing. CPU 3 spending around 35% time running nc task. Now, if I run another CPU intensive task on CPU 2, without this change /proc/<pid>/schedstat shows 100% of time accounted to this task. With this change, it rightly shows less than 25% accounted to this task as remaining time is actually spent on irq processing. Signed-off-by: Venkatesh Pallipadi <venki@google.com> Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl> LKML-Reference: <1286237003-12406-7-git-send-email-venki@google.com> Signed-off-by: Ingo Molnar <mingo@elte.hu>
Diffstat (limited to 'block')
0 files changed, 0 insertions, 0 deletions
OpenPOWER on IntegriCloud