summaryrefslogtreecommitdiffstats
path: root/lib/libc/stdtime/strftime.c
diff options
context:
space:
mode:
Diffstat (limited to 'lib/libc/stdtime/strftime.c')
-rw-r--r--lib/libc/stdtime/strftime.c130
1 files changed, 76 insertions, 54 deletions
diff --git a/lib/libc/stdtime/strftime.c b/lib/libc/stdtime/strftime.c
index 126da85..893b784 100644
--- a/lib/libc/stdtime/strftime.c
+++ b/lib/libc/stdtime/strftime.c
@@ -17,7 +17,7 @@
#ifdef LIBC_RCS
static const char rcsid[] =
- "$Id: strftime.c,v 1.17 1997/02/22 15:03:19 peter Exp $";
+ "$Id: strftime.c,v 1.18 1997/08/09 15:43:53 joerg Exp $";
#endif
#ifndef lint
@@ -234,67 +234,89 @@ label:
pt = _conv((t->tm_wday == 0) ? 7 : t->tm_wday,
"%d", pt, ptlim);
continue;
- case 'V':
- /*
- ** From Arnold Robbins' strftime version 3.0:
- ** "the week number of the year (the first
- ** Monday as the first day of week 1) as a
- ** decimal number (01-53). The method for
- ** determining the week number is as specified
- ** by ISO 8601 (to wit: if the week containing
- ** January 1 has four or more days in the new
- ** year, then it is week 1, otherwise it is
- ** week 53 of the previous year and the next
- ** week is week 1)."
- ** (ado, 5/24/93)
- */
- /*
- ** XXX--If January 1 falls on a Friday,
- ** January 1-3 are part of week 53 of the
- ** previous year. By analogy, if January
- ** 1 falls on a Thursday, are December 29-31
- ** of the PREVIOUS year part of week 1???
- ** (ado 5/24/93)
- */
- /*
- ** You are understood not to expect this.
- */
+ case 'V': /* ISO 8601 week number */
+ case 'G': /* ISO 8601 year (four digits) */
+ case 'g': /* ISO 8601 year (two digits) */
+/*
+** From Arnold Robbins' strftime version 3.0: "the week number of the
+** year (the first Monday as the first day of week 1) as a decimal number
+** (01-53)."
+** (ado, 1993-05-24)
+**
+** From "http://www.ft.uni-erlangen.de/~mskuhn/iso-time.html" by Markus Kuhn:
+** "Week 01 of a year is per definition the first week which has the
+** Thursday in this year, which is equivalent to the week which contains
+** the fourth day of January. In other words, the first week of a new year
+** is the week which has the majority of its days in the new year. Week 01
+** might also contain days from the previous year and the week before week
+** 01 of a year is the last week (52 or 53) of the previous year even if
+** it contains days from the new year. A week starts with Monday (day 1)
+** and ends with Sunday (day 7). For example, the first week of the year
+** 1997 lasts from 1996-12-30 to 1997-01-05..."
+** (ado, 1996-01-02)
+*/
{
- int i;
+ int year;
+ int yday;
+ int wday;
+ int w;
- i = (t->tm_yday + 10 - (t->tm_wday ?
- (t->tm_wday - 1) : 6)) / 7;
- if (i == 0) {
+ year = t->tm_year + TM_YEAR_BASE;
+ yday = t->tm_yday;
+ wday = t->tm_wday;
+ for ( ; ; ) {
+ int len;
+ int bot;
+ int top;
+
+ len = isleap(year) ?
+ DAYSPERLYEAR :
+ DAYSPERNYEAR;
/*
- ** What day of the week does
- ** January 1 fall on?
+ ** What yday (-3 ... 3) does
+ ** the ISO year begin on?
*/
- i = t->tm_wday -
- (t->tm_yday - 1);
+ bot = ((yday + 11 - wday) %
+ DAYSPERWEEK) - 3;
/*
- ** Fri Jan 1: 53
- ** Sun Jan 1: 52
- ** Sat Jan 1: 53 if previous
- ** year a leap
- ** year, else 52
+ ** What yday does the NEXT
+ ** ISO year begin on?
*/
- if (i == TM_FRIDAY)
- i = 53;
- else if (i == TM_SUNDAY)
- i = 52;
- else i = isleap(t->tm_year +
- TM_YEAR_BASE) ?
- 53 : 52;
+ top = bot -
+ (len % DAYSPERWEEK);
+ if (top < -3)
+ top += DAYSPERWEEK;
+ top += len;
+ if (yday >= top) {
+ ++year;
+ w = 1;
+ break;
+ }
+ if (yday >= bot) {
+ w = 1 + ((yday - bot) /
+ DAYSPERWEEK);
+ break;
+ }
+ --year;
+ yday += isleap(year) ?
+ DAYSPERLYEAR :
+ DAYSPERNYEAR;
+ }
#ifdef XPG4_1994_04_09
- /*
- ** As of 4/9/94, though,
- ** XPG4 calls for 53
- ** unconditionally.
- */
- i = 53;
+ if ((w == 52
+ && t->tm_mon == TM_JANUARY)
+ || (w == 1
+ && t->tm_mon == TM_DECEMBER))
+ w = 53;
#endif /* defined XPG4_1994_04_09 */
- }
- pt = _conv(i, "%02d", pt, ptlim);
+ if (*format == 'V')
+ pt = _conv(w, "%02d",
+ pt, ptlim);
+ else if (*format == 'g') {
+ pt = _conv(year % 100, "%02d",
+ pt, ptlim);
+ } else pt = _conv(year, "%04d",
+ pt, ptlim);
}
continue;
case 'v':
OpenPOWER on IntegriCloud