diff options
author | uqs <uqs@FreeBSD.org> | 2010-08-29 11:32:41 +0000 |
---|---|---|
committer | uqs <uqs@FreeBSD.org> | 2010-08-29 11:32:41 +0000 |
commit | 9112be80d82f5c839a88cf13631c36faca3a85a4 (patch) | |
tree | 09da399ff7c228102fa6cc57b029ee0f56c9e68f /sbin | |
parent | 2efeeccf294e7ce90b18af42e7098954b75504e8 (diff) | |
download | FreeBSD-src-9112be80d82f5c839a88cf13631c36faca3a85a4.zip FreeBSD-src-9112be80d82f5c839a88cf13631c36faca3a85a4.tar.gz |
gsched(8): fix example usage, mdoc nits
- ad0 was referred to as da0
- wrong parameter -s instead of -a in example
- use double quotes consistently
PR: docs/150082
Submitted by: N.J. Mann <njm@njm.me.uk>
MFC after: 2 weeks
Diffstat (limited to 'sbin')
-rw-r--r-- | sbin/geom/class/sched/gsched.8 | 14 |
1 files changed, 7 insertions, 7 deletions
diff --git a/sbin/geom/class/sched/gsched.8 b/sbin/geom/class/sched/gsched.8 index caa8417..7e6b113 100644 --- a/sbin/geom/class/sched/gsched.8 +++ b/sbin/geom/class/sched/gsched.8 @@ -25,7 +25,7 @@ .\" .\" $FreeBSD$ .\" -.Dd April 12, 2010 +.Dd August 29, 2010 .Dt GSCHED 8 .Os .Sh NAME @@ -92,7 +92,7 @@ which in turn forwards requests to the existing geom. This operation allows one to start/stop a scheduling service on an already existing provider. .Pp -A subsequent 'destroy' will remove the newly created geom and +A subsequent "destroy" will remove the newly created geom and hook the provider back to the original geom. .It Cm configure Configure existing scheduling provider. It supports the same options @@ -135,16 +135,16 @@ maximum amount of debug information is printed. Exit status is 0 on success, and 1 if the command fails. .Sh EXAMPLES The following example shows how to create a scheduling provider for disk -.Pa /dev/da0 -, and how to destroy it. +.Pa /dev/ad0 , +and how to destroy it. .Bd -literal -offset indent # Load the geom_sched module: kldload geom_sched # Load some scheduler classes used by geom_sched: kldload gsched_rr gsched_as -# Configure device ad0 to use scheduler 'rr': -geom sched insert -s rr ad0 -# Now provider ad0 uses the 'rr' algorithm; +# Configure device ad0 to use scheduler "rr": +geom sched insert -a rr ad0 +# Now provider ad0 uses the "rr" algorithm; # the new geom is ad0.sched. # Remove the scheduler on the device: geom sched destroy -v ad0.sched. |